Acronyms (Including Summary definition where required)

    • FDOT – Florida Department of Transportation
    • DTTM – Design Traffic Technical Memorandum (Document used to analyze anticipated future traffic volumes and evaluate alternatives to accommodate the anticipated future traffic)
    • SIMR – Systems Interchange Modification Report (Document used to analyze the preferred alternative and it’s impact on the I-75 corridor)
    • IJR – Interchange Justification Report (Document used to justify applicability of possible new interchanges with FHWA and FDOT)
    • FHWA – Federal Highway Administration (Agency with Federal oversight over Interstate Highway System)
    • PDER – Project Development Engineering Report (Document used to confirm document engineering analysis and alternatives considered)
    • CO – Central Office of the Florida Department of Transportation (Tallahassee, FL)
    • PDSR – Project Development Summary Report (Document used to summarize the impacts of a project on the physical, natural, cultural, and community features of a corridor)
    • NEPA – National Environmental Policy Act (Federal Law that provides agencies such as FDOT requirements regarding development of projects obtaining Federal Funding or Permits)